PROFINET Guideline for Commissioning with Checklists

The Design, Installation, and Commissioning Guidelines are intended to provide information on how to properly design, install and commission PROFINET and to provide practical guidance on the best ways to achieve this. The aim of this guideline is to support you when commissioning PROFINET systems. It also provides guidance on the verification of the correct installation of PROFINET systems. Moreover, this commissioning guideline helps with detection and location of possible errors. As a result, this guideline addresses topics relevant not only to commissioning staff but also to service personnel.

The presentation of information in these documents has been kept as simple as possible. Accordingly, background knowledge about PROFINET mounting and cabling is not required. However, a basic technical knowledge of electrical installation is assumed. The operating principle of PROFINET is not discussed in the Installation Guidelines. If you require this information, please use the respective documents of PI or corresponding technical literature.

By downloading these materials you are agreeing to the terms of the License for supply of Specification.

The checklist is included in the document.

Please complete the 'Been Here Before?' or 'Registration Details' form to view this content.

To view this resource...

Been Here Before?

First, enter your email address here and click "Check".

Registration Details

Otherwise, complete the form below.

Show privacy policy